Later than most people think, and sooner than most organisations get round to it. You do not need a centre of excellence to get value from in-app guidance on your first system. You need one when a second system or a second department wants guidance and the people who built the first cannot take it on without the standards slipping. Until that point, three things do the job of a centre of excellence: one named owner with time in their diary, one front door for requests, and one scoreboard. Get those right and the centre of excellence, when it comes, is a staffing decision rather than a rescue.
On more than one engagement this year the conversation has reached the same point. The first build is live or close to it, the client's own people are being trained to take over, and someone asks what next year should look like. The questions that follow are always the same: who owns the platform once the partner steps back, how do new requests get in, and what stops a second system becoming a second standard.
Because the platform arrives before the operating model. Licences are bought for one system, the first content is built by whoever has the time, and a second team hears about it and wants the same. Two systems, two builders, sometimes two partners, and nobody has written down what good looks like. We have seen guidance on two platforms in the same business that had never been compared. Neither was wrong. They were different, and the users could tell.
WalkMe's own guidance on programme governance (support.walkme.com, Governance Models, last updated November 2024) is clear on the starting point: every company should start centralised to set and test the foundation, and governance models commonly take three to five years to transition as programmes scale. The usual path runs from one central team to a hybrid, where departments add their own delivery teams under central standards. (Fiducia is a certified WalkMe partner.) The timescale tells you the organisation chart can wait. The standards cannot.
In year one, very little. A centre of excellence pools builders, sets standards, prioritises requests and reports on value across systems. One owner with protected time can do all four for a single system, so appoint that person properly before drawing a box on a chart.
ABN AMRO is a useful example. Its HR team ran the in-app guidance programme on SAP SuccessFactors itself, used the platform's usage data to find a step in the promotion process where managers needed more help, adjusted the guidance and saw returned requests fall. WalkMe's published customer story reports an 86 per cent reduction in sendbacks against roughly 2,500 manager requests a month (vendor-published figures). The ingredients were ownership and data, not headcount. A centre of excellence earns its keep later, at the point of growth.
One named owner with time. Even when a partner builds everything, someone on your side has to brief the builder, review the content and sign it off. With no hours written against that work, the build stalls at the first review, whoever is holding the tools.
One front door. Every request for guidance lands in one place, with three questions answered before anyone builds: what changes for the user, what it is likely to save (tickets, rework, minutes per task), and how complex the build is. Rank on those three. Low complexity with a visible saving goes first.
A baseline before each build. Pull the platform's own analytics before you start, and measure the action that matters, such as a form submitted correctly or a record created, rather than logins. Logins tell you people turned up. Completed actions tell you whether the guidance worked.
Written standards before the second system goes live. Naming, who sees what, where the help link points, how often content is reviewed, and the rule for retiring guidance when the underlying system changes. One page is enough.
A clear trigger for adding a team. A department gets its own builders when it can field a trained person with written hours and agrees to the standards above. If it cannot, its requests stay in the central queue. That is the hybrid model WalkMe describes, reached on evidence rather than enthusiasm.
The numbers go into the budget round. Most budget conversations for next year happen in December. Take the baseline, the completed-action figures and the scored request queue in with you. A ranked queue is a far stronger case for a second year than a wish list.
The first build gets signed off and goes quiet. The owner moves on, the backlog lives in someone's inbox, and when a second platform arrives the business starts again from scratch, often with a different partner. That is the stall-after-phase-one pattern, and in the cases we have seen the gap was ownership rather than the platform.
If you are planning next year's spend on a platform you have already paid for, run the six checks first. The gaps are usually fixable before the budget is set, and they cost far less than a centre of excellence you are not ready to staff.
Tell us what you are rolling out and where adoption, automation or AI is sticking. We will come back with a clear plan for the first steps, what success looks like, and what it costs. No fifty-slide pitch.
Book a call